Industrial building with a two-storey steel structure in production part and a reinforced concrete building for offices. The reinforced concrete structure is a monolithic building with 3 floors and one underground level with total area of 2400m2.
Commitment of VN Engineering Ltd.:
Implementation period: from 10.2019 to 02.2020