Currently, the company is focused on building a medium-sized structures of various types. Our goals are aimed at closing the whole construction process of new buildings and facilities, as well as reconstruction of existing structures. Building with our own resources at each stage of implementation ensures rational, high quality and fast achievement of a good result.
See detailsIn 2011 and 2012 VN Engineering Ltd. has performed laboratory and geodesic control of excavations and embankments, contours of built-up areas, slope angles and others during the construction of retaining wall at the Lyulyakovitsa tailings pond, part of the Assarel Medet mining and processing complex. The wall is stone with a height of 25 m and a length of 457 m. Total volume of the embankment is 430,000 m3.
See detailsHilti Bulgaria Ltd. is a long-term partner of our company in the implementation of specific construction and installation works. HILTI products occupy a major part of our technical equipment. They include hand-held electric tools, geodesic instruments, automatic wall cutting system, diamond drilling machines for holes with diameters from 8 mm to 600 mm. Maintaining a high-tech base in every aspect of our business is a top priority of the company.
See detailsFrom 2021 part of company belongings are being rented out. Our property includes a complete set of machines needed for earthworks. Different types of excavators and loaders, equipped with all accessories are being used for building and demolition activities on construction site. For specific needs of precise cutting and partly remove of structural elements, automatic systems for diamond cutting and drilling of reinforced concrete could be used.
See details