Removal of existing buildings and part of a tunnel to the Metropolitan, Ilinden district, Sofia


Demolition of existing buildings, including: substation, reinforced concrete slab from a tunnel of Metropolitan.

Commitment of VN Engineering Ltd.: Demolition of the buildings and cutting of the tunnel slab

Implementation period: from 05.01.2021 to 24.01.2021

  About us
Activities
Construction testing laboratory
Diamond cutting and drilling
CERTIFICATES
NEWS
CONTACTS

БЪЛГАРСКИ | ENGLISH
    SEARCH