Demolition of existing buildings, including: substation, reinforced concrete slab from a tunnel of Metropolitan.
Commitment of VN Engineering Ltd.: Demolition of the buildings and cutting of the tunnel slab
Implementation period: from 05.01.2021 to 24.01.2021