The projects the company has worked on — its role in each, the areas and the periods, as it described them. Where the client does not permit publication, no photographs are shown.

01

Construction

01 · Construction

Multi-family residential building with underground garage and shop

Lozenets district, Sofia

Our roleShell construction
Period08.2020 – 12.2020

A six-storey residential building with one underground garage level and a total built-up area of 982.23 m². It houses five apartments and a shop of up to 100 m², with seven parking spaces below ground. The structure is a monolithic reinforced-concrete frame.

Multi-family residential building with underground garage and shop — Lozenets district, Sofia
fig. 1 — Multi-family residential building with underground garage and shop08.2020 – 12.2020

02 · Construction

Production building

Druzhba 1–Druzhba 2 link area, Iskar district, Sofia

Our roleEarthworks; shell of the reinforced-concrete structure; stud partitions and wall linings
Period10.2019 – 02.2020

The Dorma-2 production building: a two-storey steel structure for the production area and a reinforced-concrete office block — a monolithic building of three storeys and a basement, about 2,400 m² in total.

Production building — Druzhba 1–Druzhba 2 link area, Iskar district, Sofia
fig. 2 — Production building10.2019 – 02.2020

03 · Construction

Store for industrial and packaged groceries

Krasno Selo – navigation canal area, Sofia

Our roleAll construction works for the complete building
Period08.2019 – 11.2019

A store for industrial and packaged groceries with a trolley depot and parking. Gross floor area: 500 m².

Photographs and details are withheld at the client’s request.

04 · Construction

Warehouse for non-combustible materials, cesspit and fence

Iliyantsi industrial zone, Nadezhda district, Sofia

Our roleReinforced-concrete foundations and the solid above-ground parts of the building
Period09.2020 – 01.2021

A warehouse base for Daks-96 with a gross floor area of 1,400 m²: a monolithic reinforced-concrete substructure under a steel superstructure for the storage area.

Warehouse for non-combustible materials, cesspit and fence — Iliyantsi industrial zone, Nadezhda district, Sofia
fig. 3 — Warehouse for non-combustible materials, cesspit and fence09.2020 – 01.2021

05 · Construction

Supermarket extensions

Pleven, Plovdiv, Vidin, Vratsa

Our roleAll construction works for the complete extensions
Period3 months each

Supermarket extensions in four towns. Gross floor area of the new extension: 300 m².

Photographs and details are withheld at the client’s request.

02

Reconstruction

06 · Reconstruction

Viaduct repair and restoration

km 15+940, Trakia motorway

Our rolePlacing the reinforcement cage
Period06.2020 – 08.2020

Repair and restoration of part of the substructure of the viaduct at km 15+940 on the Trakia motorway. The piers were strengthened with an additional external reinforcement cage and encased in sprayed concrete over their full surface.

Viaduct repair and restoration — km 15+940, Trakia motorway
fig. 4 — Viaduct repair and restoration06.2020 – 08.2020

07 · Reconstruction

Conversion of an existing building into a store

Oborishte district, Sofia

Our roleRemoval of non-structural parts, strengthening of structural members and every stage of building the new store
Period08.2019 – 12.2020

Conversion and change of use of the ground floor of an existing building into a grocery and household store with a gross floor area of 1,313 m².

Photographs and details are withheld at the client’s request.

08 · Reconstruction

Supermarket reconstruction and extension

Pazardzhik

Our roleDemolition of existing buildings and part of the store, extension and reconstruction, site grading
Period09.2020 – 03.2021

Reconstruction of an existing supermarket with a new extension. Built-up area of the store: 1,560 m²; extension gross floor area: 517 m²; car park: 3,500 m².

Photographs and details are withheld at the client’s request.

03

Demolition

09 · Demolition

Demolition of residential buildings

Simeonovo district, Sofia

Our roleDismantling the concrete frames by cutting out their members
Period15.07.2020 – 05.08.2020

Two residential buildings with monolithic reinforced-concrete frames, standing immediately next to each other — each of three storeys and about 350 m² gross floor area.

Demolition of residential buildings — Simeonovo district, Sofia
fig. 5 — Demolition of residential buildings15.07.2020 – 05.08.2020

10 · Demolition

Demolition of a steel arch structure

Pazardzhik

Our roleDemolition of the above- and below-ground parts
Period20.09.2020 – 28.09.2020

A 15 m high steel arch structure on a 300 m² reinforced-concrete slab.

Demolition of a steel arch structure — Pazardzhik
fig. 6 — Demolition of a steel arch structure20.09.2020 – 28.09.2020

11 · Demolition

Removal of buildings and part of a metro tunnel

Ilinden district, Sofia

Our roleDemolition of the above-ground parts and cutting out the tunnel slab
Period05.01.2021 – 24.01.2021

Demolition of existing structures — a transformer substation and the above-ground part and reinforced-concrete slab of a metro ventilation tunnel.

No photographs of this project have been published.

04

Laboratory

12 · Laboratory

Retaining dam, Lyulyakovitsa tailings pond

Assarel Medet mining and processing complex

Our roleLaboratory and geodetic control of excavation and fill, footprint outlines and slope gradients
Period2011 – 2012

A rockfill retaining dam 25 m high and 457 m long, with 430,000 m³ of fill. As part of the tailings pond’s downstream slope it is a Class I structure.

No photographs of this project have been published.