Demolition of two residential buildings with monolithic reinforced concrete skeletal structure. Each of them have been build on three floors with total area 350m2.
Commitment of VN Engineering Ltd.: Demolition of concrete buildings by cutting their components
Implementation period: from 15.07.2020 to 05.08.2020